(+86) 13586852960    |     yasheng@china-yasheng.com
You are here: Home » Products » Filter » Excavator Oil Filter 2456376 Excavator Fuel Filters

loading

Share to:
sharethis sharing button

Excavator Oil Filter 2456376 Excavator Fuel Filters

Weight: 1KG
Process:Heat Treatment
Warranty: 2 years
Applicable Industries: Construction works
Machinery Test Report: Provided
Video outgoing-inspection: Provided
Color: Yellow or as your requirement
Logo: Yassian or as your requirement
Availability:
Quantity:

  • 2456376

  • YASSIAN or Your's

 v英文详情模板01英文详情模板02英文详情模板03英文详情模板04英文详情模板05英文详情模板06

The correct installation method of Volvo EC500 Electric excavator parts

The following are the correct installation methods and key steps for Volvo EC500 Electric excavator parts:

⚙️ ‌ core installation process ‌

Pre-installation preparation ‌

Thoroughly clean the installation area ‌ : Use scrubbing or immersion to remove oil stains and impurities to prevent foreign objects from entering precision components (such as hydraulic systems) ‌.

Verify the compatibility of accessories ‌ : The dedicated accessories for the electric version (such as low-noise hydraulic pumps and lithium battery heat sinks) are not compatible with the traditional diesel models. The model ‌ needs to be checked.

Power system accessories installation ‌

Lithium battery thermal management component ‌ : When installing the temperature sensor, the interface must be sealed with a protection level of IP67, and it should be connected to the battery management computer board wiring harness ‌.

High-voltage relay (model 20797920) ‌ : after power-off operation, it should be fixed on the shockproof bracket. After wiring, the insulation resistance should be tested with a megohmmeter ‌.

Installation of mechanical structural components ‌

Track idler wheel replacement ‌ :

Release the pressure of the track tensioning cylinder to lift the fuselage and keep the tracks suspended ‌.

When disassembling the old idler wheels, use long bolts to assist in positioning and crowbars to ensure stable load-bearing (avoiding the risk of manual handling) ‌.

The screws of the new idler wheel ‌ are coated with copper powder for rust prevention ‌. After pre-tightening with an pneumatic wrench, they are weighed ‌ using a torque tool according to the standard value (refer to the maintenance manual).

Reinforced forearm cylinder (140mm bore) ‌ :

The chrome plating layer of the piston rod should be protected from scratches. After installation, the hydraulic system needs to be operated in a cycle to expel air ‌.

Filtration system installation ‌

B series pilot filter (model 0332) ‌ :

After removing the old filter element, clean the oil outlet. Apply engine oil to the sealing ring of the new filter element ‌ to enhance the sealing ‌.

When installed vertically, it should be filled with hydraulic oil ‌ to avoid insufficient lubrication ‌ at the moment of startup.

⚠️ ‌ key points to note ‌

Safe operation ‌ :

Before replacing high-voltage components (such as relays), ‌ cut off the power supply and verify that there is no residual voltage ‌‌.

Wear goggles when operating the hydraulic system to prevent high-pressure oil from splashing ‌.

Quality control ‌ :

After the electric special counterweight block (10,300kg) is installed, the tail turning radius (3,880mm) needs to be rechecked to ensure the center of gravity is balanced ‌.

Maintenance and optimization ‌ :

By taking advantage of the low-position layout of the electric model ‌ (the hydraulic pump and the electrical control box are close to the ground), the maintenance flow line is simplified ‌.

Note: Unauthorized modification of the original factory configuration (such as track width, counterweight) may affect the safety threshold and energy efficiency (the energy cost of the electric version is 50% lower than that of the diesel engine) ‌.

Previous: 
Next: