How does Trimble 3D technology reduce human errors in airport construction
Trimble 3D technology reduces human errors in airport construction through the following core mechanisms:
1. The automatic control system replaces manual operation
Precise control of paving and slope
In the construction of runways and aprons, pavers are equipped with Trimble PCS900 3D paving control system , and motor graders are integrated with Trimble GCS900 slope control system , fully automating the control of material thickness and slope. This system directly reads the design data, improving the asphalt/concrete paving accuracy to 5 mm (far superior to the 10 mm design standard), completely avoiding the deviations caused by traditional manual wire pulling positioning and manual equipment adjustment.
Stable operation in harsh conditions
The milling machine is linked with the total station through the Trimble active tracking target to automatically maintain an accurate milling depth (such as precisely stripping a 4-6 cm concrete layer) in dusty, rainy, foggy or night environments, avoiding manual measurement errors and operational mistakes.
Second, data collaboration closed-loop eliminates information distortion
Design-construction real-time synchronization
Based on the Trimble Connect cloud platform , 2,700 active BIM models are synchronized in real time to on-site devices, allowing construction workers to directly obtain the latest design version and eliminate understanding deviations caused by the transmission of paper drawings or oral instructions.
Automatic verification of completion data
Trimble WorksManager transmits design data directly to construction machinery, and the equipment transmits completion data in real time for comparison with the design model, automatically marking deviation positions. For instance, after the concrete is poured, the system immediately generates a flatness report, replacing the traditional manual spot checks and achieving "zero blind spots" acceptance.
Iii. Digital processes replace high-risk manual links
Precise layout and positioning
The traditional manual layout relying on tape measures and ropes has been replaced by Trimble's high-precision total station and digital models. The coordinates of key points are automatically located by the equipment to avoid reading errors or mark offsets.
Intelligent tracking of construction progress
Trimble WorksOS automatically collects equipment operation data and generates reports, replacing manual progress recording and eliminating the risk of data tampering or underreporting.
Effect verification : In the Peruvian airport project, 3D automation technology significantly reduced the rework rate caused by human errors, the base construction tolerance met strict standards, and the runway flatness was evaluated as "perfect".
v
How does Trimble 3D technology reduce human errors in airport construction
Trimble 3D technology reduces human errors in airport construction through the following core mechanisms:
1. The automatic control system replaces manual operation
Precise control of paving and slope
In the construction of runways and aprons, pavers are equipped with Trimble PCS900 3D paving control system , and motor graders are integrated with Trimble GCS900 slope control system , fully automating the control of material thickness and slope. This system directly reads the design data, improving the asphalt/concrete paving accuracy to 5 mm (far superior to the 10 mm design standard), completely avoiding the deviations caused by traditional manual wire pulling positioning and manual equipment adjustment.
Stable operation in harsh conditions
The milling machine is linked with the total station through the Trimble active tracking target to automatically maintain an accurate milling depth (such as precisely stripping a 4-6 cm concrete layer) in dusty, rainy, foggy or night environments, avoiding manual measurement errors and operational mistakes.
Second, data collaboration closed-loop eliminates information distortion
Design-construction real-time synchronization
Based on the Trimble Connect cloud platform , 2,700 active BIM models are synchronized in real time to on-site devices, allowing construction workers to directly obtain the latest design version and eliminate understanding deviations caused by the transmission of paper drawings or oral instructions.
Automatic verification of completion data
Trimble WorksManager transmits design data directly to construction machinery, and the equipment transmits completion data in real time for comparison with the design model, automatically marking deviation positions. For instance, after the concrete is poured, the system immediately generates a flatness report, replacing the traditional manual spot checks and achieving "zero blind spots" acceptance.
Iii. Digital processes replace high-risk manual links
Precise layout and positioning
The traditional manual layout relying on tape measures and ropes has been replaced by Trimble's high-precision total station and digital models. The coordinates of key points are automatically located by the equipment to avoid reading errors or mark offsets.
Intelligent tracking of construction progress
Trimble WorksOS automatically collects equipment operation data and generates reports, replacing manual progress recording and eliminating the risk of data tampering or underreporting.
Effect verification : In the Peruvian airport project, 3D automation technology significantly reduced the rework rate caused by human errors, the base construction tolerance met strict standards, and the runway flatness was evaluated as "perfect".